Upon completion of all construction or maintenance of facilities, the utility or person
or other entity performing construction within the city's right-of-way shall remove
all excess material and restore all turf and terrain in a timely manner and to the
satisfaction of the city. This includes restoration of entrances and side roads. Restoration
of roadway surfaces shall be made using materials and methods approved by the director
of economic development and zoning. Such cleanup and repair may be required to consist
of backfilling, regarding, reseeding, resodding, or any other requirement to restore
the right-of-way to a condition substantially equivalent to that which existed prior
to the commencement of the project. Any sod or seeded area shall be maintained by
the utility until the area is satisfactorily established.